Pass SAP SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Exam in First Attempt Guaranteed Updated Dump from DumpsMaterials!
Pass C-TSCM42-67 Exam with 108 Questions - Verified By DumpsMaterials
SAP PP Certification Exam Details:
| Sample Questions | SAP PP Certification Sample Questions |
| Duration | 180 mins |
| Exam Code | C_TSCM42_67 |
| Number of Questions | 80 |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Exam Price | $550 (USD) |
| Passing Score | C_TSCM42_67 - 63% |
| Schedule Exam | SAP Training |
| Level | Associate |
NEW QUESTION 28
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
- A. The MRP elements are linked via fixed pegging.
- B. Requirements planning has not been carried out.
- C. The delta between the availability dates falls within the tolerance window defined in Customizing.
- D. The fixed planned order is outside the rescheduling horizon.
Answer: C,D
NEW QUESTION 29
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Activate the availability check and assign an overall profile in the production scheduling profile.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
- D. Assign an appropriate availability checking rule to the material master for the product.
Answer: C
NEW QUESTION 30
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?
- A. N (non-stock item)
- B. M (phantom material)
- C. D (document item)
- D. E (external procurement)
Answer: A
NEW QUESTION 31
Which functions can be triggered before releasing a production order? (Choose three)
- A. Confirmation
- B. Selection of a BOM
- C. Selection of a routing
- D. Stock determination
- E. Scheduling
Answer: B,C,E
NEW QUESTION 32
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
- A. Consumption can result in subsequent adjustments of planned receipts.
- B. Consumption can reduce the originally planned production quantity.
- C. Consumption takes place with the planning material.
- D. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
Answer: A
NEW QUESTION 33
What do you have to consider regarding consumption? (Choose two)
- A. Consumption is restructured with the planning run.
- B. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- C. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
- D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
Answer: C,D
NEW QUESTION 34
A material was planned in the context of SAP ECC material requirements planning. The MRP controller subsequently processed the material by manually converting a specific planned order into a production order.
The MRP controller now accesses the current stock/requirements list and the MRP list for this material and compares these two lists.
What do you have to consider for the two lists at this stage? (Choose two)
- A. The MRP list displays the production order.
- B. The MRP list has the status "processed".
- C. The stock/requirements list displays the production order.
- D. The stock/requirements list was updated the moment it was accessed.
Answer: C,D
NEW QUESTION 35
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)
- A. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
- B. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
- C. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
- D. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
Answer: B,D
NEW QUESTION 36
What are characteristics of repetitive manufacturing? (Choose three)
- A. Production without using production orders and without status management
- B. Continuous material consumption, production flow and output
- C. Shop fabrication
- D. Automatic line loading based on capacity limits across all production lines
- E. Period-based planning of the quantities to be produced
Answer: A,B,E
NEW QUESTION 37
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
- A. In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.
- B. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- C. Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.
- D. Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.
Answer: A
NEW QUESTION 38
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
- A. Define the user statuses in the Customizing table of the system statuses.
- B. Define a status profile in Customizing and assign it to the production scheduling profile.
- C. Define the user statuses in the order type-dependent parameters.
- D. Define a status profile in Customizing and assign it to the order type.
Answer: D
NEW QUESTION 39
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)
- A. Production Scheduling Profile
- B. Material Master (Finished Product)
- C. Routing
- D. Material Master (Component)
- E. Work Center
Answer: C,D,E
NEW QUESTION 40
Where can you define the valid receivers for production order costs?
- A. In the valuation variant
- B. In the production scheduling profile
- C. In the settlement profile
- D. In the costing variant
Answer: C
NEW QUESTION 41
You select the master data for production orders via production versions.
Which information is contained in a production version?
- A. The default order type to be used
- B. The routing and BOM alternatives to be used
- C. The explosion dates for the routing and BOM
- D. The control parameters for selecting routings and BOM
Answer: B
NEW QUESTION 42
Which of the following scheduling types can only be used in capacity planning?
- A. Forward
- B. Midpoint
- C. Only capacity requirements
- D. Backward
Answer: B
NEW QUESTION 43
Which of the following master data is necessary for the creation of material reservations for production orders?
- A. Production/resource tools
- B. Routings
- C. Material master records
- D. Production versions
Answer: C
NEW QUESTION 44
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
- A. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning
- B. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning
- C. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning
- D. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning
Answer: A
NEW QUESTION 45
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
- A. The static safety stock and the material forecast
- B. The average daily demand and the desired range of coverage
- C. The static safety stock per day and the safety time
- D. The average daily demand and the safety time
Answer: B
NEW QUESTION 46
Which of the following statements best defines SAP ERP?
- A. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
- B. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.
- C. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
- D. SAP ERP is an application that a company can use to manage its business processes efficiently.
Answer: D
NEW QUESTION 47
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. A storage location may be assigned to different MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. Subcontracting is supported by MRP areas.
- D. An MRP area may include different storage locations.
Answer: C,D
NEW QUESTION 48
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)
- A. In-house production time (material master)
- B. Formulas (work center)
- C. Standard values (routing)
- D. Operation control key (routing)
- E. Transport time (routing)
Answer: B,C,D
NEW QUESTION 49
Which issue can occur if the lot size-dependent in-house production time in the material master is not updated after changing the routing?
- A. Lead time scheduling cannot take place.
- B. Requirements planning creates an appropriate exception message in basic dates scheduling.
- C. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
- D. Dependent requirements request the components from the bill of materials at wrong times when using basic dates scheduling.
Answer: D
NEW QUESTION 50
What do you have to consider regarding lot size procedures?
- A. If a long-term lot size is used, procurement is conducted with a long-term perspective.
- B. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
- C. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
- D. The lot size quantity can be influenced using a minimum lot size and the rounding profile.
Answer: D
NEW QUESTION 51
......
SAP C-TSCM42-67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
Penetration testers simulate C-TSCM42-67 exam: https://www.dumpsmaterials.com/C-TSCM42-67-real-torrent.html