NEW QUESTION 47
Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits
- A. A list of boundary values for "advance amount"
- B. A description of dependencies between test cases
- C. A logical collection of test cases
- D. An approach to regression testing
Answer: D
NEW QUESTION 48
For which of the following would maintenance testing be used?
- A. Correction of defects during the development phase.
- B. Complaints about system quality during user acceptance testing.
- C. Integrating functions during the development of a new system.
- D. Planned enhancements to an existing operational system.
Answer: D
NEW QUESTION 49
Which of the following is a role of a formal review? [K1]
- A. Corrector
- B. Moderator
- C. Governor
- D. Adjudicator
Answer: B
NEW QUESTION 50
A new system is about to be developed. Which of the following functions has the highest level of risk?
- A. Likelihood of failure = 10%; impact value = E150,000
- B. Likelihood of failure = 2%; impact value = E200,000
- C. Likelihood of failure = 1%; impact value = E500,000
- D. Likelihood of failure = 20%; impact value = E100,000
Answer: D
Explanation:
In (B) the product of probability x impact has the value E15,000; in (C) the value is E5,000 and in (D) it is E4,000. The value of E20,000 in (A) is therefore the highest.
NEW QUESTION 51
Statement Coverage will not check for the following:
- A. Dead Code
- B. Missing Statements
- C. Unused Branches
- D. Unused Statement
Answer: B
NEW QUESTION 52
Which of the following is a Black Box test design technique?
- A. Error Guessing
- B. Equivalence Partitioning
- C. Decision Coverage
- D. Statement Coverage
Answer: B
NEW QUESTION 53
The purpose of requirement phase is:
- A. To understand user needs
- B. To define the scope of testing
- C. All of the above
- D. To freeze requirements
Answer: C
NEW QUESTION 54
Who is responsible for conducting test readiness review..?
- A. Project Manager
- B. Test Engineer
- C. None of the above
- D. Test Manager
Answer: D
NEW QUESTION 55
Which of the following accurately defines the integration testing test level? [K2]
- A. Test basis includes component requirements, test objects include database modules, and tests concentrate on the behaviour of the system as a whole.
- B. Test basis includes software and system design, test objects include interfaces, and tests concentrate on the interactions between different parts of a system
- C. Test basis includes use cases, test objects include user procedures and tests concentrate on a high level model of system behaviour
- D. Test basis includes business processes, test objects include system configuration and configuration data, and tests concentrate on establishing confidence in the system
Answer: B
NEW QUESTION 56
Which of the following is not a part of the Test Implementation and Execution Phase?
- A. Designing the Tests
- B. Comparing actual results
- C. Executing test cases either manually or by using test execution tools
- D. Creating test suites from the test cases
Answer: A
NEW QUESTION 57
Which test management control option is most appropriate to adopt under these circumstances? 2 credits
- A. Arrange a meeting with the user community representatives to discuss the user interface.
- B. Reconsider the exit criteria and review the test plan in the context of the current situation.
- C. Advise the user community regarding the reduced scope of requirements and the additional incremental delivery.
- D. Introduce mandatory evening and weekend working to retrieve the 3 week slippage.
Answer: B
NEW QUESTION 58
Which of these are objectives for software testing?
- A. Determine the productivity of programmers
- B. Uncover software errors
- C. Eliminate every error prior to release
- D. Eliminate the need for future program maintenance
Answer: B
NEW QUESTION 59
What are metrics NOT used for?
- A. To identify the percentage of work done in test case preparation.
- B. To identify the percentage of work done in test environment preparation.
- C. To measure whether dates of test milestones were met.
- D. To apply to the RAD development model.
Answer: D
NEW QUESTION 60
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
a.Any deviation from the procedures described in the test strategy document
b.The overall estimated costs, timescales and resource requirements
c.A detailed schedule of testing activities
d.The development deliverables to be tested
e.Which test staff members (names) will be involved and when
f.Level of requirements coverage achieved
Which THREE of the above mentioned characteristics relate to the master test plan? 1 credit
- A. a
- B. d
- C. b
- D. f
- E. c
- F. e
Answer: A,B,C
NEW QUESTION 61
Which of the following would you least expect to form part of the analysis of initial tool costs? 1 credit
- A. Learning time required to use the new tool
- B. Tool portability
- C. Evaluation of suitable tools
- D. Integration with other tools
Answer: B
NEW QUESTION 62
The effect of testing is to:
- A. Give an indication of the software quality;
- B. Increase software quality;
- C. Show there are no problems remaining?
- D. Enable those responsible for software failures to be identified;
Answer: A
NEW QUESTION 63
Which of the following activities is appropriate to the test planning stage?
- A. Analysing the test basis
- B. Writing a test execution schedule
- C. Assigning resources for the planned activities
- D. Designing the test environments
Answer: C
NEW QUESTION 64
Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test Which of the following is the BEST detail on an incident report? [K3]
- A. Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description.
Script eod 1.4 fails when the first transaction of the day is a future dated transaction.
Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions - see PID ver 1.3 para 10b iv. - B. Title. Screen TRN-003B validation of transaction date.. Reproducible. No. Description.
When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached. - C. Title. End of Day failure.. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.
- D. Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod
1..4 fails . Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not allow future dated transactions - see PID ver 1.3 para 10b iv.
Answer: A
NEW QUESTION 65
Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits
- A. Create an estimate based on the complexity of the code
- B. Create an estimate based on the credentials of the successful bidder
- C. Create an estimate based on the function point analysis technique and test point analysis
- D. Create an estimate based on a percentage of the development effort
Answer: C
NEW QUESTION 66
In the MASPAR case study..?
- A. Security failures were the result of untested parts of code
- B. An error in the code was so obscure that you had to test the function with almost every input value to find its two special-case failures
- C. The development team achieved complete statement and branch coverage but missed a serious bug in the MASPAR operating system
- D. All the above
Answer: B