[Jun-2023] Exam PMI-PBA New Brain Dump Professional - DumpsMaterials [Q25-Q45] | DumpsMaterials

[Jun-2023] Exam PMI-PBA New Brain Dump Professional - DumpsMaterials [Q25-Q45]

Share

[Jun-2023] Exam PMI-PBA: New Brain Dump Professional - DumpsMaterials

Free PMI-PBA Exam Dumps to Improve Exam Score


Preparation Process

Those students who want to pass the exam at the first attempt should have thorough preparation. The PMI does not provide them with the training options, but it recommends following the tips that are listed below:

  • Utilize the PMI-PBA Examination Content Outline – With this resource, you will discover all the knowledge and skills that will be validated in the test. You will also see the scope of the exam content that allows you to find the proper study materials;
  • Take the Formal Study Course Offered by Authorized Training Partners or PMI Chapters – This option allows the students to get all the information from the certified PMI instructions and those individuals who have already passed this test.
  • Observe the PMI-PBA Handbook – This tutorial is designed to provide you with all the important information about the procedures and policies for maintaining and achieving the PMI-PBA certification. You will also find useful tips by reading notes throughout this handbook;
  • Study the PMI-PBA Reference List – This list contains the books and articles that can be used during the preparation process;

 

NEW QUESTION # 25
An organization is evaluating the possibility of conducting business internationally. Which factors should be investigated at the onset of the initiative?

  • A. External dependencies
  • B. Deliverables to be produced
  • C. Impacts on requirements baseline
  • D. Change control processes

Answer: A


NEW QUESTION # 26
For a large, highly complex project with significant risk, which elicitation technique should be used to analyze input to and output from the product?

  • A. Interface analysis
  • B. Risk analysis
  • C. System analysis
  • D. Dependency analysis

Answer: D


NEW QUESTION # 27
Which of the following techniques contrasts the current and desired business views to analyze possible business changes?

  • A. SWOT analysis
  • B. Gap analysis
  • C. Trend analysis
  • D. Impact analysis SWOT analysis

Answer: B


NEW QUESTION # 28
An insurance company embarks on a project to replace its current enrollment and billing software application, which will no longer be supported by the end of the calendar year. The new enrollment and billing application must be implemented before the current vendor contract ends. The business analyst gathers the initial requirements for the new enrollment and billing application. Based on the large volume of requirements, the business analyst realizes that the requirements will need to be prioritized.
Which requirements prioritization method should the business analyst use for this project?

  • A. Weighted ranking
  • B. Risk analysis
  • C. Time-boxing
  • D. MoSCoW

Answer: A


NEW QUESTION # 29
A business analyst is discussing the acceptance criteria for a new measurement system with the operations manager. The operations manager is particularly concerned about the accuracy of the new system because mistakes in data measurements could be extremely costly to fix.
Which of the following is the best strategy to define the appropriate acceptance criteria?

  • A. Clearly define the maximum acceptable error rate for the new system.
  • B. Plan a training session for the new system before it is handed over to the operations manager.
  • C. Ask the operations manager to formally accept the requirements documents.
  • D. Quantify the risks associated with the measurement errors and update the risk register.

Answer: A

Explanation:
Explanation/Reference:


NEW QUESTION # 30
What should the business analyst do to ensure that all requirements meet a quality checklist before the development and testing phase?

  • A. Obtain approval from engineering for partial testing of the requirements.
  • B. Assign a verification method to each requirement.
  • C. Validate the requirements deemed important by the stakeholders.
  • D. Negotiate with the client to standardize the requirements.

Answer: C


NEW QUESTION # 31
A business analyst has incorporated all the relevant feedback from stakeholders in the business analysis plan.
Which next step should the business analyst take?

  • A. Start documenting requirements
  • B. Obtain approval on the plan.
  • C. Start implementing the project.
  • D. Store the document for safe keeping.

Answer: B


NEW QUESTION # 32
The project manager is beginning to prepare for a test readiness review with the customer. The project manager knows that the customer will want a summary of requirements that have been rejected or deferred.
The project manager has requested that the business analyst provide a list of rejected and deferred requirements.
What should the business analyst have done to complete this request?

  • A. Track rejected requirements in the system requirements verification matrix.
  • B. Spend more time up-front reviewing the requirements to limit rejections.
  • C. Set up a change control board to track the number of rejections.
  • D. Limit the number of rejected requirements on the project.

Answer: B


NEW QUESTION # 33
The document that defines the process for managing requirements revisions is the:

  • A. project management plan.
  • B. change management plan.
  • C. scope management plan.
  • D. communications management plan.

Answer: D


NEW QUESTION # 34
Through user acceptance testing, a software flaw was identified. What should the business analyst do next as part of the root cause analysis in order to analyze and resolve the discrepancy?

  • A. Create an interface analysis.
  • B. Create a fishbone diagram.
  • C. Create a Delphi estimation
  • D. Create a functional decomposition.

Answer: B


NEW QUESTION # 35
Once the requirements are compared to internal and external quality standards, what should the business analyst do next?

  • A. Baseline the requirements.
  • B. Set the priority of the requirements.
  • C. Communicate the requirements to stakeholders.
  • D. Ensure that the requirements are validated.

Answer: D

Explanation:
Explanation


NEW QUESTION # 36
A business analyst is developing a traceability matrix to determine whether or not any gaps exist and to identify any discrepancies.

Which critical field is needed to ensure that the traceability matrix is usable?

  • A. Owner
  • B. Hierarchy
  • C. Requirements description
  • D. Status

Answer: C


NEW QUESTION # 37
A business analyst has been assigned to a project team that is redesigning the company's website. The business analyst has been documenting the relationships between requirements and has found requirements that do not trace to a business need.
Which type of requirements are these?

  • A. In-scope
  • B. Implemented
  • C. Out-of-scope
  • D. Tested

Answer: A


NEW QUESTION # 38
Which statement accurately depicts what changes can be made to requirements after they are baselined?

  • A. Requirements cannot be changed once user acceptance testing begins.
  • B. Requirements cannot be changed once development begins.
  • C. Requirements can be changed only with sponsor approval.
  • D. Requirements can be changed through a defined process.

Answer: D


NEW QUESTION # 39
A company has launched a new online sales application and engaged a focus group to test how quickly the customer could place an order. The focus group also provided feedback on their satisfaction.
Which metrics tool should the business analyst use to record the results?

  • A. Customer
  • B. Business completion
  • C. Focus group
  • D. Sales and marketing

Answer: B


NEW QUESTION # 40
A business analyst is ready lo begin requirements elicitation; however, stakeholders are not available to participate for another two weeks. Which elicitation technique should the business analyst use during this time?

  • A. Cost-benefit analysis
  • B. Document analysis
  • C. Benchmarking
  • D. Brainstorming

Answer: B


NEW QUESTION # 41
During the project execution phase, the client requests the addition of a new feature. Which of the following would allow the business analyst to determine the impact for the specific requirement change?

  • A. Requirements management tool
  • B. Requirements cards
  • C. Requirements traceability matrix
  • D. Requirements baseline

Answer: C


NEW QUESTION # 42
Which of the following is a properly written requirement statement?

  • A. The pot shall be manufactured in the following colors: yellow, red, brown, blue.
  • B. The pot shall be usable in the oven or on the stove.
  • C. The pot shall prominently display the company brand.
  • D. The pot shall be lightweight and heat up quickly.

Answer: A


NEW QUESTION # 43
While preparing a business case, an experienced business analyst faces difficulty in deciding which of three different solution options to recommend. The senior vice president (SVP) who requested the business case favors an outsourced solution; however, an analysis favors a custom-developed solution, either built internally or using contract labor.
To prepare the recommendation, what should the business analyst do?

  • A. Recommend the SVP's choice, as It is most likely to be adopted.
  • B. Formulate a weighted-ranking matrix.
  • C. Perform solution evaluation
  • D. Review the stakeholder analysis.

Answer: B


NEW QUESTION # 44
What should a business analyst do after discovering that two solution requirements conflict?

  • A. Consult the sponsor(s) and log the constraint.
  • B. Update the requirements baseline and upload it to the project repository.
  • C. Communicate the conflict to stakeholders and facilitate a resolution.
  • D. Perform an impact analysis and propose a lower-cost alternative,

Answer: C

Explanation:
Explanation/Reference: https://flylib.com/books/en/4.445.1.232/1/